A typical working arrangement would be that first we work out general performance specification and layout details with the architect. Providence next works with the selected specialty garage engineer to provide foundation designs to support the reactions provided to them by the garage design firm.

Other times Providence will provide the design of the entire garage. Additionally, there are times when Providence will design a structure that incorporates traditional building and parking into the same complex.

"Champion Painting was awarded the contract for Surface Preparation and Coating Application of the Tribeca Pedestrian Bridge, which spans the West Side Highway at Chambers Street in one of the busiest areas of NYC. We knew that this would be a challenging project in all aspects, from protection of traffic and the travelling public to performing the coating application during the coldest months of the year. Champion Painting had utilized the services of Providence Engineering, and specifically Patti Seitz on numerous other projects. For this project, Patti’s design took into account all requirements and criteria. Once the design phase was complete, and while maintaining constant communication with Champion Painting, Patti worked very closely with our steel fabrication shop during the entire process, fielding and answering all questions from the fabricator. As they say, “the proof is in the pudding”, and this turned out to be the perfect dish. This is probably the first job where everything on the drawings matched up perfectly with everything in the field. From the intricate steel cable system to the fabricated outrigger system, a very difficult project was made less so, largely to a design that took into account all of our needs. Great job Patti, and Providence Engineering."

Declan Farrington
Champion Painting

RELATED PROJECTS CONTACT US VIEW SERVICES SEE MORE PROJECTS