Along with the design architect, who provides a direct link to the church’s designated building committee; Providence is a key part of the design team working to ensure that the goals of the church are met with regard to both space and budget. Whether a completely new building, an addition or renovations, Providence is familiar with the unique challenges associated with church construction and is ready to address them. The goal is always to provide our client, the architect, and their client, the church, with a project that will serve the needs of the congregation for years to come.

"Champion Painting was awarded the contract for Surface Preparation and Coating Application of the Tribeca Pedestrian Bridge, which spans the West Side Highway at Chambers Street in one of the busiest areas of NYC. We knew that this would be a challenging project in all aspects, from protection of traffic and the travelling public to performing the coating application during the coldest months of the year. Champion Painting had utilized the services of Providence Engineering, and specifically Patti Seitz on numerous other projects. For this project, Patti’s design took into account all requirements and criteria. Once the design phase was complete, and while maintaining constant communication with Champion Painting, Patti worked very closely with our steel fabrication shop during the entire process, fielding and answering all questions from the fabricator. As they say, “the proof is in the pudding”, and this turned out to be the perfect dish. This is probably the first job where everything on the drawings matched up perfectly with everything in the field. From the intricate steel cable system to the fabricated outrigger system, a very difficult project was made less so, largely to a design that took into account all of our needs. Great job Patti, and Providence Engineering."

Declan Farrington
Champion Painting

RELATED PROJECTS CONTACT US VIEW SERVICES SEE MORE PROJECTS